Projetu: Títulu:
G0180: Road Network Development Sector Project
ATP nia ID: 87292191220
Estatutu:
Kompleta ona
Rezultadus (outcomes)ne'ebé hakarak atu atinje:
Improved access to social and economic facilities in project areas
Deskrisaun:
The Project is sector-based in design,will finance part of the mediumterm road network development program. At the end of the Project, (i) about 232 kilometers (km) of national roads will have been improved to maintainable condition; (ii) a road maintenance program (RMP) will have been established; (iii) access roads and parking areas of crossborder
facilities will have been built at Mota Ain, Salele, Sakato, and Oesilo; (iv) national contractors will have gained improved capacity to implement roadworks; (v) the Ministry of Infrastructure (MOI) will have improved its ability to administer road projects and the RMP; (vi) road safety awareness in the project areas will have increased; and (vii) climate-proofing measures will have become a regular part of road design and construction.
Rezultadus Ikus Projetu nian:
1. Road rehabilitated
2. Road maintenance program established
3. Border posts constructed inMota Ain, Salele,Sakato, and Oesilo
4. Improved capacity of national contractors to implement road rehabilitation and maintenance works
5. Improved MOI capacity to manage road projects and road maintenance program
6. Improved awareness of road safety among communities in project areas
7. Climate-proofing incorporated into road rehabilitation and maintenance
Alokasoins ba Egualidade Jéneru
Atribuisaun indiretu
ID Organizasaun Finansiamentu no Projetu Internál sira nian:
- Organization Name: Asian Development Bank
- Organization Acronym: ADB
- Organization Group: Asian Development Bank Group
- Organization Type: Multilateral
- Organization Code: ADB
|
- Organization Name: Ministry of Public Works
- Organization Acronym: MOPW
- Organization Group: RDTL Line Ministry
- Organization Type: Government of Timor-Leste
- Organization Code: MOPW
|
|
[Ministry of Public Works]
|
|
Data Akordu Asinadu:
26/02/2010
Dataatu Hahú ne'ebé propoin:
05/04/2010
Data Hahú Aktuál :
05/04/2010
Data atu Remata ne'ebé propoin:
31/05/2015
Data Kompletu Aktuál:
Data Ikus ba Kontratasaun:
|
[Timor-Leste]
[Bobonaro]
[Atabae]
|
5%
|
|
[Timor-Leste]
[Bobonaro]
[Balibo]
|
5%
|
|
[Timor-Leste]
[Bobonaro]
[Bobonaro]
[Lourba]
|
6%
|
|
[Timor-Leste]
[Bobonaro]
[Bobonaro]
[Oeleu]
|
6%
|
|
[Timor-Leste]
[Bobonaro]
[Cailaco]
|
6%
|
|
[Timor-Leste]
[Bobonaro]
[Maliana]
|
6%
|
|
[Timor-Leste]
[Cova Lima]
[Fatululic]
[Fato Lulik]
|
6%
|
|
[Timor-Leste]
[Cova Lima]
[Suai]
|
6%
|
|
[Timor-Leste]
[Cova Lima]
[Tilomar]
[Salele]
|
6%
|
|
[Timor-Leste]
[Cova Lima]
[Zumalai]
|
6%
|
|
[Timor-Leste]
[Ermera]
[Atsabe]
|
6%
|
|
[Timor-Leste]
[Ermera]
[Ermera Kota]
|
6%
|
|
[Timor-Leste]
[Ermera]
[Hatolia]
|
6%
|
|
[Timor-Leste]
[Ermera]
[Railaco]
|
6%
|
|
[Timor-Leste]
[Liquica]
[Bazartete]
[Tibar]
|
6%
|
|
[Timor-Leste]
[Oecussi]
[Oesilo]
|
6%
|
|
[Timor-Leste]
[Oecussi]
[Pante Makasar]
|
6%
|
|
Nivel implementasaun:
|
Nivel Distritu
|
|
Fatin Implementasaun:
|
Distritu
|
|
[Strategic Development Plan Pillars] [INFRASTRUCTURE DEVELOPMENT] [ROADS AND BRIDGES]
|
100.0% |
Primary Sector
|
DAC-CRS Sector Scheme
-
210 - TRANSPORT AND STORAGE
-
-- 2109 - Transport and storage (Sub-sector)
-
-- -- 21020 - Road transport
|
(100)%
|
|
|
|
|
PAGAMENTU NE'EBÉ PLANEIA ONA
|
|
|
Planeia ona/Prepara daudaun
|
31/12/2014
|
2,624,500 USD
|
| |
Persentajen ne'ebé planeia ona ba Kapitál Menór no Kapitál Dezenvolvimentu: 70.0%
|
|
Planeia ona/Prepara daudaun
|
31/12/2013
|
57,641 USD
|
| |
Persentajen ne'ebé planeia ona ba Kapitál Menór no Kapitál Dezenvolvimentu: 70.0%
|
|
Planeia ona/Prepara daudaun
|
31/12/2012
|
18,612 USD
|
| |
Persentajen ne'ebé planeia ona ba Kapitál Menór no Kapitál Dezenvolvimentu: 70.0%
|
|
Sub-Totál Pagamentu sira ne'ebé planeia ona :
|
2,700,753 USD
|
|
|
|
DEZENBOLSU AKTUÁL:
|
|
|
Aktuál
|
29/06/2012
|
600 USD
|
|
Aktuál
|
31/12/2014
|
2,559,500 USD
|
|
Aktuál
|
30/12/2016
|
44,883.53 USD
|
| |
Montante: Ministry of Public Works, Transport and Communication as the Implementing Agency
|
|
SUB-TOTÁL PAGAMENTU EFETIVU:
|
2,604,983.53 USD
|
|
|
|
Saldu ne'ebé la'ós pagu:
|
-2,604,983.53 USD
|
|
|
|
|
|
|
|
|
|
PAGAMENTU NE'EBÉ PLANEIA ONA
|
|
|
Planeia ona/Prepara daudaun
|
31/12/2015
|
2,624,500 USD
|
| |
Persentajen ne'ebé planeia ona ba Kapitál Menór no Kapitál Dezenvolvimentu: 70.0%
|
|
Planeia ona/Prepara daudaun
|
31/12/2013
|
1,294,037 USD
|
| |
Persentajen ne'ebé planeia ona ba Kapitál Menór no Kapitál Dezenvolvimentu: 70.0%
|
|
Planeia ona/Prepara daudaun
|
31/12/2012
|
417,850 USD
|
| |
Persentajen ne'ebé planeia ona ba Kapitál Menór no Kapitál Dezenvolvimentu: 70.0%
|
|
Planeia ona/Prepara daudaun
|
31/12/2016
|
1,777,000 USD
|
|
Sub-Totál Pagamentu sira ne'ebé planeia ona :
|
6,113,387 USD
|
|
|
|
DEZENBOLSU AKTUÁL:
|
|
|
Aktuál
|
30/12/2011
|
920,545 USD
|
|
Aktuál
|
31/12/2010
|
658,439 USD
|
|
Aktuál
|
29/06/2012
|
365,717 USD
|
|
Aktuál
|
30/09/2012
|
68,287 USD
|
|
Aktuál
|
30/12/2014
|
2,599,500 USD
|
|
SUB-TOTÁL PAGAMENTU EFETIVU:
|
4,612,488 USD
|
|
|
|
Saldu ne'ebé la'ós pagu:
|
-4,612,488 USD
|
|
|
|
|
|
|
|
|
|
Komitementus Aktuál
|
|
|
Aktuál
|
26/02/2010
|
46,000,000 USD
|
| Kompromisu Atual subtotal:
|
46,000,000 USD
|
|
|
|
|
DEZENBOLSU AKTUÁL:
|
|
|
Aktuál
|
31/12/2013
|
12,429,000 USD
|
|
Aktuál
|
30/12/2014
|
2,559,500 USD
|
|
SUB-TOTÁL PAGAMENTU EFETIVU:
|
14,988,500 USD
|
|
|
|
Saldu ne'ebé la'ós pagu:
|
31,011,500 USD
|
|
|
|
|
|
|
|
|
|
PAGAMENTU NE'EBÉ PLANEIA ONA
|
|
|
Planeia ona/Prepara daudaun
|
31/12/2013
|
619,639 USD
|
| |
Persentajen ne'ebé planeia ona ba Kapitál Menór no Kapitál Dezenvolvimentu: 70.0%
|
|
Planeia ona/Prepara daudaun
|
31/12/2012
|
200,084 USD
|
| |
Persentajen ne'ebé planeia ona ba Kapitál Menór no Kapitál Dezenvolvimentu: 70.0%
|
|
Sub-Totál Pagamentu sira ne'ebé planeia ona :
|
819,723 USD
|
|
|
|
DEZENBOLSU AKTUÁL:
|
|
|
Aktuál
|
31/12/2010
|
315,288 USD
|
|
Aktuál
|
30/12/2011
|
440,795 USD
|
|
Aktuál
|
29/06/2012
|
2,371,005 USD
|
|
Aktuál
|
31/12/2012
|
776,367 USD
|
|
Aktuál
|
31/12/2014
|
2,559,500 USD
|
|
Aktuál
|
30/12/2016
|
44,883.53 USD
|
|
SUB-TOTÁL PAGAMENTU EFETIVU:
|
6,507,838.53 USD
|
|
|
|
Saldu ne'ebé la'ós pagu:
|
-6,507,838.53 USD
|
|
|
|
|
|
|
|
|
|
PAGAMENTU NE'EBÉ PLANEIA ONA
|
|
|
Planeia ona/Prepara daudaun
|
31/12/2013
|
13,274,684 USD
|
| |
Persentajen ne'ebé planeia ona ba Kapitál Menór no Kapitál Dezenvolvimentu: 70.0%
|
|
Planeia ona/Prepara daudaun
|
31/12/2012
|
4,286,453 USD
|
| |
Persentajen ne'ebé planeia ona ba Kapitál Menór no Kapitál Dezenvolvimentu: 70.0%
|
|
Sub-Totál Pagamentu sira ne'ebé planeia ona :
|
17,561,137 USD
|
|
|
|
DEZENBOLSU AKTUÁL:
|
|
|
Aktuál
|
31/03/2015
|
846,000 USD
|
| |
Persentajen ne'ebé planeia ona ba Kapitál Menór no Kapitál Dezenvolvimentu: 70.0%
|
|
Aktuál
|
30/12/2011
|
769,809 USD
|
|
Aktuál
|
30/09/2012
|
2,250,215 USD
|
|
Aktuál
|
31/12/2012
|
1,961,157 USD
|
|
Aktuál
|
31/12/2014
|
2,559,000 USD
|
|
Aktuál
|
31/12/2015
|
11,934,112 USD
|
|
Aktuál
|
30/06/2015
|
1,320,883 USD
|
|
Aktuál
|
30/09/2015
|
818,023 USD
|
|
Aktuál
|
31/03/2016
|
8,946 USD
|
|
Aktuál
|
30/06/2016
|
8,904 USD
|
|
Aktuál
|
30/12/2016
|
44,883.53 USD
|
| |
Montante: Ministry of Public Works, Transport and Communication as the Implementing Agency
|
|
SUB-TOTÁL PAGAMENTU EFETIVU:
|
22,521,932.53 USD
|
|
|
|
Saldu ne'ebé la'ós pagu:
|
-22,521,932.53 USD
|
|
|
|
|
|
|
|
|
|
Komitementus Aktuál
|
|
|
Aktuál
|
26/02/2010
|
6,900,000 USD
|
| Kompromisu Atual subtotal:
|
6,900,000 USD
|
|
|
|
|
Saldu ne'ebé la'ós pagu:
|
6,900,000 USD
|
|
|
|
|
|
| |
|
Totál Kompromisu Efetivu sira: |
52,900,000 USD
|
|
|
Totál Pagamentu sira ne'ebé planeia ona: |
27,195,000 USD
|
|
|
Totál Pagamentu Efetivu sira: |
51,235,742.59 USD
|
|
|
Saldu ne'ebé la'ós pagu: |
1,664,257.41 USD
|
|
|
Taxa entrega:
|
97%
|
|
|
|
Organizasaun Doadór
-
Ministry of Public Works, Transport and Communication
|
Ajénsia Ezekusaun
-
Ministry of Public Works, Transport and Communication
100 %
|
Ajénsia Implementasaun
-
Asian Development Bank
90 %
-
Ministry of Public Works, Transport and Communication
10 %
|
RDTL Instituisaun Benefisiariu
-
Ministry of Public Works, Transport and Communication
100 %
|
Divizaun Instituisaun Benefisiariu RDTL
-
Ministry of Public Works, Transport and Communication - National Directorate of Roads, Bridges and Floods Control Services
100 %
|
|
Indikadór 1
|
|
Karik projetu ida ne'e uza nasaun nia kuadru-serbisu ba rezultadus?
Loos
|
|
|
Indikadór 6
|
|
Projetu ne'e hala'o tuir orsamentu no iha eskrutíniu parlamentár?
|
|
|
Indikadór 9b
|
|
Karik projetu ne'e uza prosedimentus nasionál ba ezekusaun orsamentál?
|
|
|
Karik projetu ne'e uza prosedimentus nasionál ba relatóriu finanseiru?
Loos
|
|
|
Karik projetu ne'e uza prosedimentus nasionál ba auditória?
Loos
|
|
|
Karik projetu ne'e uza sistemas nasionál ba aprovizionamentu?
Loos
|
|
|
Apoiu ba Setór Governu
|
|
Karik projetu ne'e formalmente konkordadu tiha ona (mak hanesan: iha memorandu de entendimentu, akordu projetu, nsst.) ho entidade Guvernu nian ida?
Loos
|
|
|
Atsabe
|
| Títulu |
Atsabe |
| Deskrisaun |
11105.01 Education, level unspecified, activity unspecified or does not fit under any other applicable codes 11110.01 Education policy and administrative management, activity unspecified or does not fit elsewhere in group The Project will finance a portion of medium-term road network development program. At the end of the Project, about 232 km of national or district roads and will have been improved to maintainable condition; (ii) an RMP will have been established; access roads and parking areas will have been built to improve cross-border facilities at Mota Ain, Salele, Sakato, and Oesilo; (iv) national contractors will have gained increased capacity to implement roadworks; MOI will have improved its ability to implement road projects and the RMP; (vi) road safety awareness in the project areas will have increased; and climate-proofing measures will have become a regular part of road design and construction. |
| Latitude |
-8.925 |
| Lonjitude |
125.39806 |
|
Ermera
|
| Títulu |
Ermera |
| Deskrisaun |
16050.01 Basic multisector social services activities 21010.03 Institution capacity building, Transport 21020.03 Public transportation systems - Roads and Bridges
- Capacity development (institutional development)
- Better access to markets, health facilities, schools and other social services |
| Latitude |
-8.75222 |
| Lonjitude |
125.39694 |
|
Gleno
|
| Títulu |
Gleno |
| Deskrisaun |
16050.01 Basic multisector social services activities 21010.03 Institution capacity building, Transport 21020.03 Public transportation systems - Roads and Bridges
- Capacity development (institutional development)
- Better access to markets, health facilities, schools and other social services |
| Latitude |
-8.72389 |
| Lonjitude |
125.43611 |
|
Liquica
|
| Títulu |
Liquica |
| Deskrisaun |
16050.01 Basic multisector social services activities 21010.03 Institution capacity building, Transport 21020.03 Public transportation systems - Roads and Bridges
- Capacity development (institutional development)
- Better access to markets, health facilities, schools and other social services |
| Latitude |
-8.5875 |
| Lonjitude |
125.34194 |
|
Maliana
|
| Títulu |
Maliana |
| Deskrisaun |
16050.01 Basic multisector social services activities 21010.03 Institution capacity building, Transport 21020.03 Public transportation systems 21020.02 Road infrastructure, road vehicles The Project will finance a portion of medium-term road network development program. At the end of the Project, about 232 km of national or district roads and will have been improved to maintainable condition; (ii) an RMP will have been established; access roads and parking areas will have been built to improve cross-border facilities at Mota Ain, Salele, Sakato, and Oesilo; (iv) national contractors will have gained increased capacity to implement roadworks; MOI will have improved its ability to implement road projects and the RMP; (vi) road safety awareness in the project areas will have increased; and climate-proofing measures will have become a regular part of road design and construction. |
| Latitude |
-8.99167 |
| Lonjitude |
125.21972 |
|
Motaain
|
| Títulu |
Motaain |
| Deskrisaun |
16050.01 Basic multisector social services activities 33120.03 Support to customs departments 21010.03 Institution capacity building, Transport 21020.03 Public transportation systems - Roads and Bridges
- Capacity development (institutional development)
- Better access to markets, health facilities, schools and other social services |
| Latitude |
-8.95694 |
| Lonjitude |
124.95444 |
|
Oe-Cussi
|
| Títulu |
Oe-Cussi |
| Deskrisaun |
11105.01 Education, level unspecified, activity unspecified or does not fit under any other applicable codes 11110.01 Education policy and administrative management, activity unspecified or does not fit elsewhere in group The Project will finance a portion of medium-term road network development program. At the end of the Project, about 232 km of national or district roads and will have been improved to maintainable condition; (ii) an RMP will have been established; access roads and parking areas will have been built to improve cross-border facilities at Mota Ain, Salele, Sakato, and Oesilo; (iv) national contractors will have gained increased capacity to implement roadworks; MOI will have improved its ability to implement road projects and the RMP; (vi) road safety awareness in the project areas will have increased; and climate-proofing measures will have become a regular part of road design and construction. |
| Latitude |
-9.20366 |
| Lonjitude |
124.35687 |
|
Oeleo
|
| Títulu |
Oeleo |
| Deskrisaun |
11105.01 Education, level unspecified, activity unspecified or does not fit under any other applicable codes 11110.01 Education policy and administrative management, activity unspecified or does not fit elsewhere in group The Project will finance a portion of medium-term road network development program. At the end of the Project, about 232 km of national or district roads and will have been improved to maintainable condition; (ii) an RMP will have been established; access roads and parking areas will have been built to improve cross-border facilities at Mota Ain, Salele, Sakato, and Oesilo; (iv) national contractors will have gained increased capacity to implement roadworks; MOI will have improved its ability to implement road projects and the RMP; (vi) road safety awareness in the project areas will have increased; and climate-proofing measures will have become a regular part of road design and construction. |
| Latitude |
-8.72917 |
| Lonjitude |
125.32 |
|
Oesilo
|
| Títulu |
Oesilo |
| Deskrisaun |
11110.03 Institution capacity building, Education The Project will finance a portion of medium-term road network development program. At the end of the Project, about 232 km of national or district roads and will have been improved to maintainable condition; (ii) an RMP will have been established; access roads and parking areas will have been built to improve cross-border facilities at Mota Ain, Salele, Sakato, and Oesilo; (iv) national contractors will have gained increased capacity to implement roadworks; MOI will have improved its ability to implement road projects and the RMP; (vi) road safety awareness in the project areas will have increased; and climate-proofing measures will have become a regular part of road design and construction. |
| Latitude |
-9.36667 |
| Lonjitude |
124.35 |
|
Pante Makasar
|
| Títulu |
Pante Makasar |
| Deskrisaun |
16050.01 Basic multisector social services activities 21010.03 Institution capacity building, Transport 21020.03 Public transportation systems - Roads and Bridges
- Capacity development (institutional development)
- Better access to markets, health facilities, schools and other social services |
| Latitude |
-9.2 |
| Lonjitude |
124.38333 |
|
Sakato
|
| Títulu |
Sakato |
| Deskrisaun |
16050.01 Basic multisector social services activities 33120.03 Support to customs departments 21010.03 Institution capacity building, Transport 21020.03 Public transportation systems - Roads and Bridges
- Capacity development (institutional development)
- Better access to markets, health facilities, schools and other social services |
| Latitude |
-9.17278 |
| Lonjitude |
124.45889 |
|
Suai
|
| Títulu |
Suai |
| Deskrisaun |
16050.01 Basic multisector social services activities 21010.03 Institution capacity building, Transport 21020.03 Public transportation systems 21020.02 Road infrastructure, road vehicles - Roads and Bridges
- Capacity development (institutional development)
- Better access to markets, health facilities, schools and other social services |
| Latitude |
-9.31286 |
| Lonjitude |
125.25648 |
|
Tilomar
|
| Títulu |
Tilomar |
| Deskrisaun |
11105.01 Education, level unspecified, activity unspecified or does not fit under any other applicable codes 11110.01 Education policy and administrative management, activity unspecified or does not fit elsewhere in group The Project will finance a portion of medium-term road network development program. At the end of the Project, about 232 km of national or district roads and will have been improved to maintainable condition; (ii) an RMP will have been established; access roads and parking areas will have been built to improve cross-border facilities at Mota Ain, Salele, Sakato, and Oesilo; (iv) national contractors will have gained increased capacity to implement roadworks; MOI will have improved its ability to implement road projects and the RMP; (vi) road safety awareness in the project areas will have increased; and climate-proofing measures will have become a regular part of road design and construction. |
| Latitude |
-9.34001 |
| Lonjitude |
125.11278 |
|
Zumalai
|
| Títulu |
Zumalai |
| Deskrisaun |
16050.01 Basic multisector social services activities 21010.03 Institution capacity building, Transport 21020.03 Public transportation systems 21020.02 Road infrastructure, road vehicles The Project will finance a portion of medium-term road network development program. At the end of the Project, about 232 km of national or district roads and will have been improved to maintainable condition; (ii) an RMP will have been established; access roads and parking areas will have been built to improve cross-border facilities at Mota Ain, Salele, Sakato, and Oesilo; (iv) national contractors will have gained increased capacity to implement roadworks; MOI will have improved its ability to implement road projects and the RMP; (vi) road safety awareness in the project areas will have increased; and climate-proofing measures will have become a regular part of road design and construction. |
| Latitude |
-9.1575 |
| Lonjitude |
125.45056 |
|