===== ERROR =====
L3456-TIM: Dili-Baucau Highway Project
Eksporta ba PDF Eksporta ba Word
Informasaun finansiamentu   (USD)
Totál Kompromisu Efetivu sira:
49,650,000 USD
Totál Kompromisu sira ne'ebé planeia ona:
0 USD
Totál Pagamentu Efetivu sira:
0 USD
Totál Pagamentu sira ne'ebé planeia ona:
0 USD
Organizasaun: Informasaun
Atividade Kria Husi:
ADB User
Atividade Kria Bá:
20/07/2017

Atividade aktualizada iha loron:
31/07/2017
Kriadu iha espasu-serbisu:
Asian Development Bank - Ekipa
Jestór Workspace nian:
ADB User - adb@amp.org
Komputasaun:
Loos
 
Identifikasaun
Projetu: Títulu: 
L3456-TIM: Dili-Baucau Highway Project
ATP nia ID: 
872923612082

Estatutu:  Hala'o nafatin
Rezultadus (outcomes)ne'ebé hakarak atu atinje: 

More reliable and safer road network.


Deskrisaun: 

The project will upgrade and climate-proof 105 kilometers (km) of the national road between the capital, Dili, and the second-largest town, Baucau, which is located on the northcoast. The government has requested the Asian Development Bank (ADB) to cofinance the proposed project on a parallel basis with the Japan International Cooperation Agency (JICA).ADB will support upgrading and climate-proofing 56 km of the road connecting the towns of
Manatuto and Baucau, and JICA will support the section between Dili and Manatuto (49 km).


Rezultadus Ikus Projetu nian: 

1. 105 km of national road between Dili and Baucau upgraded and climate-proofed.

2. Performance-based road maintenance expanded.

3. Awareness of road safety and transport-related social issues generated.



Alokasoins ba Egualidade Jéneru
Atribuisaun indiretu

ID Organizasaun Finansiamentu no Projetu Internál sira nian: 
Agency Internal IDs
Oráriu Atividade

Data Akordu Asinadu:  22/12/2016
Dataatu Hahú ne'ebé propoin: 
Data Hahú Aktuál :  02/05/2017
Data atu Remata ne'ebé propoin:  30/11/2022
Data Kompletu Aktuál: 
Data Ikus ba Kontratasaun: 
Fatin
[Timor-Leste] [Baucau] 100%

Nivel implementasaun: Nivel Distritu

Fatin Implementasaun: Distritu

Planu Nasionál
[Strategic Development Plan Pillars] [INFRASTRUCTURE DEVELOPMENT] [ROADS AND BRIDGES] 50.0%
[Strategic Development Plan Pillars] [INFRASTRUCTURE DEVELOPMENT] 50.0%

PED
Setór
Primary Sector
DAC-CRS Sector Scheme - 210 - TRANSPORT AND STORAGE - -- 2109 - Transport and storage (Sub-sector) - -- -- 21020 - Road transport (100)%

Finansiamentu Parseiru Dezenvolvimentu nian
Organizasaun: Naran : Asian Development Bank
Organizasaun: Knaar : doadór
Tipu Asisténsia nian : Empréstimu
Modalidade de Apoiu : Projetu: Apoiu
Komitementus Aktuál
Aktuál 22/12/2016 49,650,000 USD  
Kompromisu Atual subtotal: 49,650,000 USD    
Saldu ne'ebé la'ós pagu: 49,650,000 USD    


Organizasaun: Naran : Infrastructure Fund
Organizasaun: Knaar : Ajénsia Ezekusaun
Tipu Asisténsia nian : Empréstimu
Modalidade de Apoiu : Projetu: Apoiu
Komitementus Aktuál
Aktuál 22/12/2016 27,190,000 USD  
Kompromisu Atual subtotal: 27,190,000 USD    
Saldu ne'ebé la'ós pagu: 27,190,000 USD    


 
Totál Kompromisu Efetivu sira: 49,650,000 USD    
Saldu ne'ebé la'ós pagu: 49,650,000 USD    
Dokumentu sira ne ' ebé relasiona ho
Organizasaun sira ne ' ebé relasiona ho
Organizasaun Doadór
  • Asian Development Bank
  • Infrastructure Fund

Ajénsia Ezekusaun
  • Infrastructure Fund 100 %

Ajénsia Implementasaun
  • Ministry of Public Works, Transport and Communication 100 %

RDTL Instituisaun Benefisiariu
  • Ministry of Public Works, Transport and Communication 100 %

Divizaun Instituisaun Benefisiariu RDTL
  • Ministry of Public Works, Transport and Communication - Directorate General for Public Works 50 %
  • Ministry of Public Works, Transport and Communication - National Directorate of Roads, Bridges and Floods Control Services 50 %

Informasaun kontaktu
Doadór nia Informasaun Kontaktu Finansiamentu: 
Rustam Ishenaliev - - 192 +63 2 6362444 ;

Indikadores Parseria Globál
Indikadór 1
Karik projetu ida ne'e uza nasaun nia kuadru-serbisu ba rezultadus?

  • Indikadór 6
    Projetu ne'e hala'o tuir orsamentu no iha eskrutíniu parlamentár?

  • Indikadór 9b
    Karik projetu ne'e uza prosedimentus nasionál ba ezekusaun orsamentál?

  • Karik projetu ne'e uza prosedimentus nasionál ba relatóriu finanseiru?

  • Karik projetu ne'e uza prosedimentus nasionál ba auditória?

  • Karik projetu ne'e uza sistemas nasionál ba aprovizionamentu?

  • Apoiu ba Setór Governu
    Karik projetu ne'e formalmente konkordadu tiha ona (mak hanesan: iha memorandu de entendimentu, akordu projetu, nsst.) ho entidade Guvernu nian ida?

  • Lokasoins Atividade