===== ERROR =====
The Project of River Training for the protection of Mola Bridge (Construction)
Eksporta ba PDF Eksporta ba Word
Informasaun finansiamentu   (USD)
Totál Kompromisu Efetivu sira:
11,358,277.81 USD
Totál Kompromisu sira ne'ebé planeia ona:
0 USD
Totál Pagamentu Efetivu sira:
8,933,487.59 USD
Totál Pagamentu sira ne'ebé planeia ona:
19,080,530.94 USD
Organizasaun: Informasaun
Atividade Kria Husi:
JICA User
Atividade Kria Bá:
15/08/2013

Atividade aktualizada iha loron:
20/07/2017
Kriadu iha espasu-serbisu:
Japan - Ekipa
Jestór Workspace nian:
JICA User - jica@amp.org
Komputasaun:
Loos
 
Identifikasaun
Projetu: Títulu: 
The Project of River Training for the protection of Mola Bridge (Construction)
ATP nia ID: 
87292404977

Estatutu:  Kompleta ona
Rezultadus (outcomes)ne'ebé hakarak atu atinje: 

To protect existing abutments and piers of Mola Bridge as well as to conduct river protection work.


Deskrisaun: 

The project aims to reinforce the pires and abutments of the existing bridge against scour and to reconstruct the concrete revetments in consideration of the tractive force of the river as well as flood flow impacts, so that the traffic function of the national route can be secured.


Rezultadus Ikus Projetu nian: 

Protection work of Mola Bridge and retaining wal was completed




ID Organizasaun Finansiamentu no Projetu Internál sira nian: 
Agency Internal IDs
Oráriu Atividade

Data Akordu Asinadu:  15/08/2013
Dataatu Hahú ne'ebé propoin:  15/08/2013
Data Hahú Aktuál :  15/08/2013
Data atu Remata ne'ebé propoin:  30/11/2015
Data Kompletu Aktuál:  18/09/2015
Data Ikus ba Kontratasaun: 
Fatin
[Timor-Leste] [Cova Lima] [Zumalai] 100%

Nivel implementasaun: Nivel Distritu

Fatin Implementasaun: Distritu

Planu Nasionál
[Strategic Development Plan Pillars] [INFRASTRUCTURE DEVELOPMENT] [ROADS AND BRIDGES] 100.0%

PED
Setór
Primary Sector
DAC-CRS Sector Scheme - 210 - TRANSPORT AND STORAGE - -- 2109 - Transport and storage (Sub-sector) - -- -- 21020 - Road transport (100)%

Finansiamentu Parseiru Dezenvolvimentu nian
Organizasaun: Naran : Japan International Cooperation Agency
Organizasaun: Knaar : doadór
Tipu Asisténsia nian : Doasaun
Modalidade de Apoiu : Projetu: Apoiu
Kategoria Apropriasaun (ba De'it Dezenbolsu Aktuál) : Kapitál Dezenvolvimentu
Komitementus Aktuál
Aktuál 15/08/2013 11,358,277.81 USD  
Kompromisu Atual subtotal: 11,358,277.81 USD    
PAGAMENTU NE'EBÉ PLANEIA ONA
Planeia ona/Prepara daudaun 02/03/2013 662,499.33 USD  
Planeia ona/Prepara daudaun 01/03/2014 5,743,176.91 USD  
Planeia ona/Prepara daudaun 02/04/2015 3,779,337.16 USD  
Planeia ona/Prepara daudaun 04/02/2015 4,024,761.19 USD  
Sub-Totál Pagamentu sira ne'ebé planeia ona : 14,209,774.59 USD    
DEZENBOLSU AKTUÁL:
Aktuál 02/05/2016 USD  
SUB-TOTÁL PAGAMENTU EFETIVU:    
Saldu ne'ebé la'ós pagu: 11,358,277.81 USD    


Organizasaun: Naran : Japan International Cooperation Agency
Organizasaun: Knaar : doadór
Tipu Asisténsia nian : Doasaun
Modalidade de Apoiu : Projetu: Apoiu
PAGAMENTU NE'EBÉ PLANEIA ONA
Planeia ona/Prepara daudaun 14/04/2015 4,870,756.34 USD  
Sub-Totál Pagamentu sira ne'ebé planeia ona : 4,870,756.34 USD    
DEZENBOLSU AKTUÁL:
Aktuál 16/06/2014 4,120,381.6 USD  
Aktuál 31/03/2015 1,324,019.44 USD  
Aktuál 30/06/2015 2,400,967.81 USD  
Aktuál 31/12/2015 1,088,118.73 USD  
SUB-TOTÁL PAGAMENTU EFETIVU: 8,933,487.59 USD    
Saldu ne'ebé la'ós pagu: -8,933,487.59 USD    


 
Totál Kompromisu Efetivu sira: 11,358,277.81 USD    
Totál Pagamentu sira ne'ebé planeia ona: 19,080,530.94 USD    
Totál Pagamentu Efetivu sira: 8,933,487.59 USD    
Saldu ne'ebé la'ós pagu: 2,424,790.22 USD    
Taxa entrega: 79%   
Dokumentu sira ne ' ebé relasiona ho
Organizasaun sira ne ' ebé relasiona ho
Organizasaun Doadór
  • Japan International Cooperation Agency

Ajénsia Ezekusaun
  • Japan International Cooperation Agency 100 %

Ajénsia Implementasaun
  • Japan International Cooperation Agency 100 %

RDTL Instituisaun Benefisiariu
  • Ministry of Public Works, Transport and Communication 100 %

Divizaun Instituisaun Benefisiariu RDTL
  • Ministry of Public Works, Transport and Communication - National Directorate of Roads, Bridges and Floods Control Services 100 %

Informasaun kontaktu
Indikadores Parseria Globál
Indikadór 1
Karik projetu ida ne'e uza nasaun nia kuadru-serbisu ba rezultadus?

  • Indikadór 6
    Projetu ne'e hala'o tuir orsamentu no iha eskrutíniu parlamentár?

  • Indikadór 9b
    Karik projetu ne'e uza prosedimentus nasionál ba ezekusaun orsamentál?

  • Karik projetu ne'e uza prosedimentus nasionál ba relatóriu finanseiru?

  • Karik projetu ne'e uza prosedimentus nasionál ba auditória?

  • Karik projetu ne'e uza sistemas nasionál ba aprovizionamentu?

  • Apoiu ba Setór Governu
    Karik projetu ne'e formalmente konkordadu tiha ona (mak hanesan: iha memorandu de entendimentu, akordu projetu, nsst.) ho entidade Guvernu nian ida?

  • Lokasoins Atividade  
    Mota Mola
    Títulu Mota Mola
    Deskrisaun 14081.01 All water supply and sanitation education/training activities 21020.02 Road infrastructure, road vehicles River Training for the protection of Mola Bridge (Construction). SDP: Roads and Bridges
    Latitude -9.15194
    Lonjitude 125.46167


    Mota Mola
    Títulu Mota Mola
    Deskrisaun stream
    Latitude -9.1519
    Lonjitude 125.4617